Photo Archive
Hall A, B, & C Installation Photos
Hall A
assembly crane installed by Westinghouse
Jefferson Lab News Flash: First Beam to Hall A!
High Resolution Spectrometer
Crane View 1
(23 Nov 94)
Crane View 2
(23 Nov 94)
Hall B
CLAS Toroid being installed by Oxford Instruments
First Three of Six Segments, Region I Drift Chamber
(January 27, 1997)
Top View of the 1st Region 2 wire chamber being installed in the CLAS
Beam Line View of the 1st Region 2 wire chamber being installed in the CLAS
CLAS shower counter being installed on forward carriage.
View 1 of CLAS Toroid: Six-Coil Assembly
(Photo by
Chris Surber
, 18 Jan 95)
View 2 of CLAS Toroid: Six-Coil Assembly
(Photo by
Chris Surber
, 18 Jan 95)
Three Installed Coils
View Along Beam Line
(23 Nov 94)
View 1 from Above
(23 Nov 94)
View 2 from Above
(23 Nov 94)
Coil Ready for Installation
(23 Nov 94)
First of six forward shower counters installed on the front carriage
View 1
View 2
Hall C
HMS, SOS & Target Chamber
High Momentum Spectrometer and Short Orbit Spectrometer
Cryotarget for T
2
0
(Mar 97)
T
2
0 Experiment Equipment
(Mar 97)
Cerenkov Detectors
(Apr 96)
Hall C SOS Spectrometer and Pivot
(Photo by
Chris Surber
, 18 Jan 95)
Donal Day and Chris Cothran of UVA inspect the
mirrors of the HMS Cerenkov
SOS, 1st detector element being installed by Jefferson Lab User
(23 Nov 94)
View from downstream of HMS, SOS, & Target Chamber
(23 Nov 94)
maintained by
webmaster@jlab.org