Re: next DC/tracking meeting on Tuesday, 4/14/98, 10:30 B101

Liming Qin (liming@physics.odu.edu)
Sun, 12 Apr 1998 23:21:01 -0400

Franz,
I have to skip next Tuesday meeting because of other commitment.

a. Rob has changed the dc_nominial_geom.c in cvs to place the R2 wires
at the actual positions. Stepan will find out soon what changes it will
make to the elastic spectra.

b. I will start reorganizing the dc/ code relevant to XVST. Rustam and I
are working on the

determining t0 from TDC spectra for 6x6 superlayers;
parameterizing the x(t) function including a B dependence;
studying the time walk vs beta;
parameterizing the sigma(t) function.

We will report our progress as we go.
Regards,
Liming